Stormwater Rectification Stage 3

Read More Carrot icon
graphic graphic

Details

Description

Following the successful completion of Stage 2 relining, Aaro Group were awarded the Stage 3 Relining works at the Port of Brisbane.

The first stage of works entailed full CCTV and assessment of 28 drainage lines across the wharf at Berth 3, AAT Terminal. Following the initial assessment, design was completed for the proposed lines to be relined.  Relining materials were ordered based on the design and installation works commenced.

Challenges for the project include scheduling of works around tidal movements, plugging of lines and ongoing dewatering, mussel removal from lines affected by sea water ingress and maintaining shipping movements on the wharf.  Works also included the removal and reinstatement of the manhole lids and asphalt to allow access to the drain lines.

Aaro Group have maintained a strong relationship with the Port of Brisbane and are in discussions for future works at other berth locations within the Port.

Summary

$2.3m

Total Net Volume

Client
Port of Brisbane
Location
Brisbane
Project Duration
8 Months
Project Start
November 2022
Project Finish
July 2023

Gallery

>
Featured Modal Image

Talk to our Construction Experts

We support our clients when they need it most. Contact our experts to see how Aaro can partner with your business.

Leave a Reply

Your email address will not be published. Required fields are marked *