Aaro Projects

Culvert Relining Stage 5

Read More Carrot icon
graphic graphic

Details

Description

Arc engaged AARO to rehabilitate aging concrete pipe culverts across its railway network, many of which had exceeded their design life. Issues such as cracks, exposed steel reinforcements, and differential settlement compromised structural integrity, requiring immediate upgrades.

To minimise disruptions, AARO implemented Glass Reinforced Plastic (GRP) liners. These durable, self-supporting structures were installed under live rail conditions, avoiding track shutdowns.

Key Deliverables

  • Designed GRP liners with a 50-year design life and compliance with Australian standards.
  • Installed liners, headwalls, and aprons to improve structural and hydraulic performance.
  • Conducted CCTV inspections for quality assurance.
  • Delivered comprehensive inspection and safety compliance reports.

The project restored the structural integrity of the culverts, extended their lifespan, and ensured railway safety with minimal operational disruptions. AARO’s efficient delivery and innovative approach achieved high client satisfaction.

Summary

$316k

Total Net Volume

Client
Arc Infrastructure
Location
31 Regional Locations
Project Duration
11 Months
Project Start
February 2024
Project Finish
January 2025

Gallery

>
Featured Modal Image

Talk to our Construction Experts

We support our clients when they need it most. Contact our experts to see how Aaro can partner with your business.

Aaro Projects

Newdegate WWTP Redirect Inlet Sewer Line

Read More Carrot icon
graphic graphic

Details

Description

Aaro was awarded the contract for the Newdegate Wastewater Treatment Plant (WWTP) Inlet Sewer Line Redirection by Water Corporation.

Water Corporation required a contractor to manage the complete manufacture, supply, construction, testing, and commissioning of new wastewater conveyance and treatment infrastructure assets.

List of Project Services:

  • Intercepted the existing incoming sewer line and redirected to the southeast corner of the primary pond
  • Constructed new manholes and installed bypass sewer pipework
  • Installed a baffle curtain in the primary pond to optimise treatment flow
  • Optimised the plant’s hydraulic profile between the new inlet manhole
  • and existing systems
  • Adjusted inlet and outlet pipework levels as required
  • Installed isolation stopboards in new junction manholes to enable future use of bypass pipework
  • Decommissioned the existing inlet sewer and rehabilitated earthworks within the WWTP boundary fence
  • Removed and disposed of stored sludge, geobags, bunded liner, and sandbags at an approved landfill

Aaro’s dedicated project managers and site supervisors ensured a high level of customer service and professionalism throughout each phase of the project, adhering to Water Corporation’s quality and safety standards at every step.

Summary

$316k

Total Net Volume

Client
Water Corporation
Location
Newdegate
Project Duration
2 Months
Project Start
April 2024
Project Finish
June 2024

Gallery

>
Featured Modal Image

Talk to our Construction Experts

We support our clients when they need it most. Contact our experts to see how Aaro can partner with your business.

Aaro Projects

Stormwater Rectification Stage 3

Read More Carrot icon
graphic graphic

Details

Description

Following the successful completion of Stage 2 relining, Aaro Group were awarded the Stage 3 Relining works at the Port of Brisbane.

The first stage of works entailed full CCTV and assessment of 28 drainage lines across the wharf at Berth 3, AAT Terminal. Following the initial assessment, design was completed for the proposed lines to be relined.  Relining materials were ordered based on the design and installation works commenced.

Challenges for the project include scheduling of works around tidal movements, plugging of lines and ongoing dewatering, mussel removal from lines affected by sea water ingress and maintaining shipping movements on the wharf.  Works also included the removal and reinstatement of the manhole lids and asphalt to allow access to the drain lines.

Aaro Group have maintained a strong relationship with the Port of Brisbane and are in discussions for future works at other berth locations within the Port.

Summary

$2.3m

Total Net Volume

Client
Port of Brisbane
Location
Brisbane
Project Duration
8 Months
Project Start
November 2022
Project Finish
July 2023

Gallery

>
Featured Modal Image

Talk to our Construction Experts

We support our clients when they need it most. Contact our experts to see how Aaro can partner with your business.

Aaro Projects

DSL Paradise Creek PS Culvert UV CIPP

Read More Carrot icon
graphic graphic

Details

Description

Aaro was awarded the contract by Cowans Plumbing to deliver a critical culvert rehabilitation project utilising state of the art UV CIPP technology. The project was designed to rehabilitate a deteriorating culvert, ensuring long-term durability and reduced maintenance costs.

Scope of Works

  • Mobilisation and demobilisation of personnel, equipment, and materials.
  • Supply and precise installation of two UV CIPP liners, 1030mm in diameter and 24m in length, with a thickness of 7.9mm.
  • Curing of liners to specified standards to achieve durability and functionality.

The UV CIPP liners were installed successfully, enhancing the culvert’s performance and lifespan. The project met all quality and timeline requirements, reflecting Aaro’s commitment to efficient and innovative infrastructure solutions.

Summary

$225k

Total Net Volume

Client
Cowans Plumbing Services
Location
Port Headland
Project Duration
4 Months
Project Start
May 2024
Project Finish
September 2024

Gallery

>
Featured Modal Image

Talk to our Construction Experts

We support our clients when they need it most. Contact our experts to see how Aaro can partner with your business.

Aaro Projects

Neerabup Water Reservoir Overflow Upgrade

Aaro ensured the safe and efficient construction of essential infrastructure, including the in-situ headwall and the integration of a new DN800 pipe section

Read More Carrot icon
graphic graphic

Details

Description

Aaro ensured safe and efficient construction of essential infrastructure, including an in-situ headwall and integration of a new DN800 pipe section.

Aaro is pleased to announce the successful award and completion of the contract for the Neerabup Water Reservoir Overflow upgrade.

The project included the construction of an in-situ headwall connected to the existing parapet wall, as well as the integration of a new DN800 pipe section with the current overflow pipework.

Key aspects of the project included:

  • Providing safe excavation
  • Constructing a dust-proof barrier to prevent foreign contamination of drinking water
  • Engaging a specialized welding contractor
  • Completing formwork and concrete works
  • Installing a precast cover
  • Expanding or constructing an emergency spillway with stone pitching

The works were completed on time and within budget, reflecting Aaro’s commitment to delivering high-quality infrastructure projects efficiently and effectively.

Summary

$367k

Total Net Volume

Client
Water Corporation
Location
Neerabup Reservoir
Project Duration
1 Month
Project Start
December 2023
Project Finish
January 2024

Gallery

>
Featured Modal Image

Talk to our Construction Experts

We support our clients when they need it most. Contact our experts to see how Aaro can partner with your business.

Aaro Projects

Reconstruction of Onslow Stormwater Ocean Outlets

Read More Carrot icon
graphic graphic

Details

Description

Aaro was proud to be awarded the contract for the Reconstruction of the Onslow Stormwater Ocean Outlets project by the Shire of Ashburton. The project was essential to extend the drainage for the townsite and replace severely deteriorated assets.

Project Scope:

  • Removal of existing rock armour
  • Removal of old drainage systems
  • Installation of new drainage and headwalls with flood gates
  • Reinstatement and additional placement of rock armour

One of the main challenges encountered during the project was the daily tidal movements. However, through careful planning and by scheduling alternative tasks during high tides, Aaro was able to complete the project within the required timeframe.

Aaro’s team of experienced project managers and site supervisors worked closely with the Shire of Ashburton, delivering high-quality customer service. Their professionalism and expertise ensured the successful completion of the project, meeting all expectations and requirements.

Summary

$629k

Total Net Volume

Client
Shire of Ashburton
Location
Onslow
Project Duration
1 Month
Project Start
September 2024
Project Finish
October 2024

Gallery

>
Featured Modal Image

Talk to our Construction Experts

We support our clients when they need it most. Contact our experts to see how Aaro can partner with your business.

Aaro Projects

Slurry Microtunnelling Twin Casings at Broome North Pipeline

Read More Carrot icon
graphic graphic

Details

Description

Aaro Microtunnelling, contracted by Roadline Civil Contractors, carried out Slurry Microtunnelling Twin casings RCP600 – 600 steel casing installation and jacking process spanning 84 meters towards the ocean in Broome,1 of 12 crossings.

The tasks included:

  • Slurry Microtunnelling RCP600 Class 4 Jacking Pipe.
  • Installing a HDPE355 pressure main on HX65 brackets
  • Slurry Microtunnelling Steel casing 600mm Jacking Pipe installed/ 1200 mm away same launch pit.
  • Installing a HDPE560 pressure main on HD30 brackets.
  • Both lines are fully grouted between the HDPE and RCP/ Steel casings.
  • Completion of cavity grouting, prepared for testing.
Summary

$1.5m

Total Net Volume

Client
Roadline Civil Contractors
Location
Broome
Project Duration
4 Months
Project Start
March 2022
Project Finish
July 2022

Gallery

>
Featured Modal Image

Talk to our Construction Experts

We support our clients when they need it most. Contact our experts to see how Aaro can partner with your business.

Aaro Projects

Dampier Potable Water Upgrade – Installation of Replacement Potable Water Line

Read More Carrot icon
graphic graphic

Details

Description

Aaro Group was engaged by Rio Tinto to replace the Peninsula Palms supply mains.

The project involved:

  • Clearing vegetation along the easement and reinstating grassed areas as needed.
  • Coordinating with RTIO Utilities for pipeline isolation and draining.
  • Excavating trenches per AS-0130-P-00011specifications, including under two driveways.
  • Removing the existing DN150 MSCL watermain and installing 250 meters of DN150 PN20 PVC Blue Brute pipe with necessary fittings.
  • Completing two tie-ins to the existing pipeline at Peninsula Palms and the southern end near Tin City.
  • Conducting commissioning activities, including flushing, hydrostatic testing at 900 KPa, and disinfection, with chlorinated water disposed of at Dampier WWTP.

This project highlights Aaro Group’s dedication to quality and safety in infrastructure work.

Summary

$382k

Total Net Volume

Client
RIO Tinto
Location
Dampier
Project Duration
3 Months
Project Start
August 2024
Project Finish
November 2024

Gallery

>
Featured Modal Image

Talk to our Construction Experts

We support our clients when they need it most. Contact our experts to see how Aaro can partner with your business.

Aaro Projects

Stormwater CCTV and Inspection

Read More Carrot icon
graphic graphic

Details

Description

Aaro were pleased to be awarded the contract for the CCTV and Inspection contract for the Shire of Ashburton. The works involved mobilising to the town of Paraburdoo to complete 4997m of CCTV asset condition assessment surveys.

The purpose of the project survey was to complete 10 area plans using data software WinCan VX within Australian standards WSA 05-2020 to establish the following:

  • Location, accessing and inspection of stormwater assets
  • Asset data collection (diameter, shape, material)
  • Defect identification and grading
  • Condition and Serviceability assessment and rating

The Shire would then use the data to support them in their maintenance planning for 2023/24.

Aaro successfully delivered the works earlier than expected and this resulted in a cost-saving for the Shire. And were able to complete the data reports before the practical completion date.

Summary

$78k

Total Net Volume

Client
Shire of Ashburton
Location
Paraburdoo
Project Duration
1 Month
Project Start
June 2023
Project Finish
June 2024

Gallery

>
Featured Modal Image

Talk to our Construction Experts

We support our clients when they need it most. Contact our experts to see how Aaro can partner with your business.