Culvert Relining at Lake Bathurst

A remote site, with ongoing challenges, where the Aaro experts were able to successfully reline three locations.

Aaro were engaged by John Holland Rail (JHR) to reline three culvert locations under the New South Wales Country Regional Network (CRN).  The lines were located on the Joppa Junction to Canberra line, approximately 294kms from Sydney towards Canberra. The three locations consisted of fourteen DN1200 CSP and five DN1500 CSP, approx. 17m each in length.

Due to its remote location, one of the ongoing challenges was access to the culverts to get the lining material into place, as each box was 2.5tonne.  In two locations, we were able to construct a temporary track to allow for access down to the catchment.  In the third location we designed a safety plan, that was approved by the Client, to utilise an excavator to track the boxes into place.  This removed the need to disturb the natural environment.

$650k

Client

John Holland Rail

Location

Canberra, ACT

Project Duration

2 months

Project Start

November 2019

Project Finish

December 2019

RelatedProjects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

$420kCulvert and Pipeline RehabilitationUV CIPP Relining
Distance was no issue to the Aaro experts who travelled through Regional WA relining culverts under the Arc Infrastructure Rail Network.
Regional WA

Our experts can make your next project a success.

Discover how Aaro could provide you with expert solutions backed by experience.

Get in touch
One group, many services